Question
You administer a Windows Server 2012 R2 server with the Hyper-V role installed.
You plan to integrate the Hyper-V host server with the existing storage infrastructure.
You need to configure all virtual machines (VMs).
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.
Answer